Procurement note

Optical Eyewear Sourcing Checklist: 8 Steps I Run Before Approving Any PO

2026-11-20 · Jane Smith

If you are a distributor, eyewear brand founder, or retail buyer who is about to approve a purchase order for wholesale optical eyewear — especially from Wenzhou or any other Chinese eyewear cluster — this is for you. I'm not going to sell you a framework. I'm going to give you the exact checklist I use so I don't repeat the mistakes I've already paid for.

Quick context on me: I've been handling optical eyewear sourcing orders for six years. In that time I've made — and documented — 11 significant mistakes, totaling roughly $18,000 in wasted budget across samples, redo fees, and expedited freight. I now maintain this checklist for our team. There are 8 steps. They take 45 minutes to walk through. Skipping any one of them has cost me money at least once.

Step 1 — Lock the frame specification in writing (not in a photo)

In my first year (2019), I sent a supplier a photo of a frame we wanted to replicate. They sent back a quote within 48 hours. I approved it. Three weeks later, the sample arrived with a hinge that felt like a bottle cap and a temple length two millimeters off. Photo-based specs are the most common beginner mistake in this category — and the supplier isn't at fault if you didn't give them numbers.

What you need in writing, per SKU: material (acetate, TR90, titanium, stainless steel), lens width / bridge / temple in millimeters, hinge type and spring or non-spring, frame weight target, Pantone color reference with a physical swatch standard, and logo placement with print method. If you can't fill in all eight, you're not ready to quote.

Step 2 — Marry the certification requirement to your actual market

This is the step I'd argue gets skipped the most. Certification isn't one thing. Optical frames are regulated differently depending on where they land. In the EU, frames are covered under Regulation (EU) 2017/745 (MDR) and need CE marking documentation. In the UK, that became UKCA. In the US, ophthalmic frames fall under 21 CFR 886.5842 as Class I devices — which means establishment registration and device listing, not just a sticker. And non-prescription sunglasses sit under a completely different rule set (21 CFR 801.410 for impact resistance, plus ANSI Z80.3 for lenses).

I learned this the expensive way in Q1 2021: I assumed a CE self-declaration covered a UK delivery. It didn't. The container sat at Felixstowe for 11 days while we produced UKCA documentation. That was roughly $2,600 in demurrage and storage plus a very awkward conversation with the client.

Before you request a quote, write down the destination market and the actual document you need — test reports, DoC, device listing number, whatever it is. Then ask the supplier to send the exact documents for the exact SKU. Certificates for a different model number are worthless and, from what I've seen, common.

Step 3 — Break the quote into TCO components, not a unit price

Unit price is the number that gets compared. It's also the number that lies. What I now ask every supplier for, in writing, is a five-line breakdown: unit price, tooling or mold fee, sample fee, packaging (per piece and per carton), and freight to the destination port with the shipping method named.

Why it matters: in 2022 I had two quotes for a titanium optical eyewear frame. One was $4.10 per piece, the other $4.60. I picked the $4.10. The tooling fee on the cheaper option was $480 and the packaging was quoted separately — together the real landed cost was $5.55 per piece at our volume. The $4.60 quote was all-in. The phrase I now use with my team is simple: the lowest unit price is often the highest total cost.

TCO here also includes time. If a cheaper supplier is two weeks slower and you're paying storage or missing a retail launch window, that two weeks is a cost line, not a footnote.

Step 4 — Order samples and torture-test them (don't just look)

Every supplier will send you a nice sample. The problem is that the sample is not the production run. What I do now: order three samples per SKU — one to inspect, one to test to destruction, one to keep as the golden reference. Tests that have caught real problems for us:

  • Open and close the hinge 500 times in one sitting (yes, really — count).
  • Drop it from 1.5 meters onto tile, hinge-open and hinge-closed.
  • Leave it on a windowsill for a week to check for acetate warping or color shift.
  • Weigh it — if the sample is 2g lighter than the spec, the frame wall thickness is wrong.

That testing caught a hinge failure in a 2023 batch where the sample passed visual inspection cleanly. If we had skipped it, we would have shipped a 1,200-piece order with a failure rate we later estimated at 15%.

Step 5 — Check MOQ and tooling at three different order scales

The MOQ a supplier quotes you on a single line item is not the MOQ on a mixed order. If you want 8 colors at 50 pieces each, you may hit an MOQ on color, not on total units. Ask for pricing at three quantities — say 300, 800, and 2,000 pieces — and specifically ask whether color changes or logo changes reset the MOQ.

This is also where tooling fees hide. A logo mold is often a one-time charge, but color changes may require separate plate charges per color. On a small designer optical eyewear run, I once paid $180 in plate fees per color because I assumed one logo setup covered all six colorways. It didn't.

Step 6 — Set QC checkpoints before production, not after

Agree on the AQL level and the inspection points in writing before the PO goes out. What we use: AQL 2.5 for major defects, AQL 4.0 for minor, with a mid-production check at 30% completion and a pre-shipment inspection at 100% of cartons marked. Third-party inspection on a $10,000+ order typically runs a few hundred dollars — cheaper than discovering a 6% defect rate after the container has left.

I'll be honest: I skipped mid-production checks for the first three years because I thought they were for big importers. In 2022 we found a lens-color mismatch on 400 frames that a mid-line check would have caught before the whole batch was lacquered. That was a $1,900 redo.

Step 7 — Calculate landed cost with a real buffer

Landed cost = unit price + tooling + packaging + freight + insurance + duties + inspection fees + your time. Then add a buffer. Not 2% — my rule is 8-12% on a first order from a new supplier, tapering to 5% once a relationship is mature. The buffer exists for the things you can't see in a quote: port congestion, currency movement, a supplier choosing different (cheaper) packaging than agreed. I have never once regretted building in a buffer. I have regretted leaving one out.

Step 8 — Confirm payment terms and what happens after delivery

Get the payment structure and the after-sales terms on the same document. Typical structures I've seen from Wenzhou suppliers range from 30/70 to 50/50, with deposits paid T/T or via a trade assurance platform. What you also need in writing: the defect-replacement window, who pays return freight on defective goods, and the lead time for replacement pieces.

A clause worth pushing for on first orders: holding 20% against the inspection report rather than against delivery. Some suppliers will agree, some won't. It's worth asking.

Things the checklist won't catch

Two honest caveats before you take this and run with it.

First, this was accurate as of late 2024 in terms of where certification and typical pricing sit. Freight rates, certification processes, and supplier capacities move fast — verify current numbers before you commit a PO. On the Wenzhou side, local industry figures often cite the city as the source of roughly 40% of China's eyewear output (I've seen that number repeated at trade shows for years, though I haven't audited the methodology). That scale is real. It doesn't mean every Wenzhou supplier is equal — the spread between a good and mediocre factory in the same industrial park is wider than most buyers expect.

Second, a checklist doesn't replace a relationship. Looking back, the single biggest mistake in my six years wasn't on this list at all — it was not visiting the factory for two years and assuming a good sample meant a good production partner. If you can afford one trip a year to the Wenzhou cluster, do it. Twenty minutes on the production floor taught me more about one supplier than twelve months of email did.

Eight steps. Forty-five minutes. It's a lot cheaper than the version of this list I learned by paying for it.